Storage · Solar · Wind
Energy for a cleaner,
brighter future.
Saga Energy develops distributed battery storage, community solar, and utility-scale solar and wind, coast to coast. Founder-led, headquartered in Fort Collins, Colorado, and building where the grid meets the people on it.
- Founded
- 2024
- Reach
- National.
Who we serve
Start where you stand.
Every clean-energy project begins with a stakeholder. Pick the one that describes you, we'll meet you there.
-
01
Landowners
Lease your land with a team that returns calls.
Transparent terms, 25 to 30 year leases, local diligence, and a direct line to a Saga partner. From 10 acres to 1,000+.
Continue -
02
Community Subscribers
Lower your power bill. No rooftop required.
Community solar and shared storage designed around the neighborhoods on the feeder, with income-qualified allocations where the program requires them.
Continue -
03
Data Centers
Clean, firm power behind your meter.
Solar plus battery storage behind the meter, direct-wire arrangements where rules allow, and firm PPAs with delivery shape that matches your load curve.
Continue -
04
Utilities & Co-ops
Capacity you can defend in a rate case.
PPA-ready projects with honest interconnection timelines and IRP-aligned capacity, from a team that has signed with utilities before.
Continue
For data center developers
Building a data center?
Let's power it together.
Utility power is the long pole in every data-center tent. We partner with developers to bring clean, firm renewable energy to campus. Solar, storage, and wind structured around your load curve, your siting geography, and your commissioning window.
- Behind-the-meter solar + BESS, load-adjacent
- Direct-wire paths where utility rules allow
- Firm clean PPAs with BESS-shaped delivery
- State-by-state regulatory pathway analysis
Open invitation
We'd like to be your renewable-energy partner.
If you're developing a data center and need clean power, whether you're in diligence, siting, or already in the ground, we'd like to be in the conversation early.
See our DC offeringWhy Saga
Four operators.
One standard.
Saga is founder-led. Between the four of us, we've stood up the 864 MW Edwards-Sanborn Solar + Storage, managed 6 GW of utility-scale wind, delivered more than 1 GW to the US grid as a builder, and run community solar programs in the neighborhoods we live in.
We started Saga in 2024 because the industry needed another way of doing this: fewer layers between the landowner and the developer, more accountability to the ratepayer, and an honest posture with every counterparty. When you engage Saga, you talk to one of us, not a pass-through.
Meet the team-
Walker Willis
Co-Founder & CEO
10+ yrs renewable energy
-
Marcus Lively
Co-Founder & CDO
10+ yrs community + utility solar
-
David Nocella
Co-Founder & CFO
10+ yrs renewable energy
-
Logan Bell
Co-Founder & COO
10+ yrs wind industry
What we build
Four disciplines.
One standard.
Every project Saga develops is sized to the load it serves and the interconnection it can reach. No vaporware, no stat inflation, no pipeline padding.
- Distributed Battery Storage
Capacity, delivered.
Standalone lithium-ion BESS and solar-paired storage, right-sized for co-op distribution feeders, commercial property, and data-center adjacency. Four-hour LFP is our standard; longer duration where the offtake supports it.
Learn more - Community Solar Gardens
Savings for the meter next door.
0.5–10 MW community solar under Colorado's HB 26-1007 framework and comparable programs around the country. Designed around the subscribers on the feeder, with income-qualified allocations where the program requires them.
Learn more - Utility-Scale Solar
Power the grid actually needs.
50–300 MW tracker solar with utility, co-op, and corporate offtake. Sized to the interconnection we can reach, not the press release we'd like to write.
Learn more - Utility-Scale Wind
Where the resource actually lives.
100–400 MW onshore wind with modern 3.5–6 MW platforms. We've collectively delivered multiple gigawatts of wind to the US grid; we build where the resource, transmission, and landowner posture line up.
Learn more
Pipeline
Real projects, honestly staged.
Every project here is Saga-developed. Prior-life work our team has delivered at other companies lives on the leadership page. It doesn't count as Saga pipeline.
- CO · Weld
Sample: CO Front Range Solar + BESS
Placeholder utility-scale solar + 4-hour lithium-ion BESS on the Colorado Front Range. Used as a design reference, real project data replaces this entry.
PPA negotiation- Solar MW-AC
- 60
- BESS MWh
- 120
- Status as of
- Apr 2026
- OK · Mayes
Sample: OK Utility-Scale Solar (SPP)
Placeholder large-scale tracker solar project in the Oklahoma SPP footprint, sited near a known data-center load cluster. Used as a design reference.
Interconnection queued- Solar MW-AC
- 150
- Status as of
- Apr 2026
- VA · Stafford
Sample: VA Stafford Data-Center BTM
Placeholder behind-the-meter solar + BESS project serving a data-center anchor in Stafford County, Virginia, designed around Dominion's Special Contract path plus §56-594.02.
PPA negotiation- Solar MW-AC
- 90
- BESS MWh
- 200
- Status as of
- Apr 2026
Let's talk
Have a project?
Get in touch.
Tell us where you sit. Landowner, utility, co-op, community, or data center developer. We'll tell you exactly what we can do from there.