Skip to content
Saga Energy

Weld County, CO · ppa negotiation

Sample: CO Front Range Solar + BESS

Placeholder utility-scale solar + 4-hour lithium-ion BESS on the Colorado Front Range. Used as a design reference, real project data replaces this entry.

Solar (MW-DC)
80
Solar (MW-AC)
60
BESS (MW)
30
BESS (MWh)
120
Utility
Xcel Energy (PSCo)
ISO / RTO
WECC
Target COD
2027-Q4
Status as of
April 22, 2026

Saga play

PLACEHOLDER, demonstrates how the Saga-play narrative renders on a project detail page. Real strategic framing replaces this copy.

This is a placeholder entry used to design and review project page layout. It will be replaced with a real Saga pipeline project once the pipeline list is confirmed. Capacity numbers and dates here are illustrative, not commitments.

Site posture

The project is sited on roughly 500 acres of marginal agricultural land in Weld County, with single-axis tracker solar on the majority of the parcel and a container-scale 4-hour BESS at the point of interconnection. Parcel topology allows for continued grazing co-use on perimeter margins, which has been factored into the lease structure.

Interconnection

The project holds a position in the relevant transmission-cluster study. Capacity is sized so the interconnection is defensible even under the downside studies, we’d rather build a project that connects than market one that doesn’t.

Offtake

PPA negotiation is in process with a load-serving entity under the current capacity need. Offtaker name will be disclosed publicly once the deal executes.

Status

Permitting milestones outstanding include the CPCN filing window and a final land-use approval from the county. Project status updates flow into this page as each milestone clears.