Mayes County, OK · interconnection queued
Sample: OK Utility-Scale Solar (SPP)
Placeholder large-scale tracker solar project in the Oklahoma SPP footprint, sited near a known data-center load cluster. Used as a design reference.
- Solar (MW-DC)
- 200
- Solar (MW-AC)
- 150
- Utility
- GRDA (state-owned)
- ISO / RTO
- SPP
- Target COD
- 2028-Q2
- Status as of
- April 22, 2026
Saga play
PLACEHOLDER, OK site demonstrates the data-center BTM pathway narrative under the 2024 BTM statute + the 1 MW exception recognized by the OK Supreme Court. Real strategic copy replaces this placeholder.
Placeholder project. Illustrates how a utility-scale solar site targeting a data-center anchor offtaker reads on a project detail page.
Site posture
Approximately 1,200 acres in the MAIP-adjacent footprint with existing road access, transmission in immediate proximity, and a favorable posture toward large industrial-zoned land uses.
Interconnection
Position held in the SPP cluster study with a transmission-service timeline aligned to the late-decade COD target. The interconnection story is central to the project’s credibility and we’ll publish more as studies clear.
Offtake
Structured around a data-center or hyperscaler offtake. Oklahoma’s 2024 BTM framework plus the 1 MW exception provide the legal scaffolding; deal pathway specifics are under NDA until a public announcement is appropriate.
Status
Environmental screens complete. Title and land-control work underway. This page will update as each milestone clears.