Woodward County, OK · permitting
Sample: OK Woodward Wind
Placeholder onshore wind project in the Oklahoma panhandle resource area, sited for SPP offtake and modern 3.5–6 MW Class II turbine platforms.
- Solar (MW-AC)
- 180
- Utility
- PSO
- ISO / RTO
- SPP
- Target COD
- 2028-Q4
- Status as of
- April 22, 2026
Saga play
PLACEHOLDER, OK wind pipeline narrative renders here on real projects. Real entries include resource assessment, transmission posture, and offtake structure.
Placeholder for OK wind project design review.
Site posture
Approximately 15,000 acres under lease option across a contiguous parcel in the Oklahoma wind belt. Setback rules and recently passed state wind siting legislation factored into the layout.
Resource
Met-tower campaign confirms Class II wind conditions consistent with modern 3.5–6 MW turbine platforms. Capacity factor estimates align with what SPP has historically seen in the region.
Offtake
Structured for utility offtake under SPP’s capacity auction posture plus a tenor matching a tax-equity-led capital stack. Specific counterparty disclosure follows deal execution.
Status
Permitting active at state and county levels. Transmission-service request submitted to SPP; study queue position held.